$219 · 20–45 minutes with David · fee may be applied toward a battery or new system
The short answer
Most solar owners we audit have the same problem: the house now uses far more power than when the panels went in, so the old system covers less every year and the true-up grows. The fix depends on the home. Sometimes it is a battery alone, sometimes a non-export add-on that keeps NEM 1.0 or 2.0 untouched, and sometimes it is planning ahead for the end of NEM. Results are projections from each home’s audit; every home’s numbers differ.
Same audit, different answers
Battery only, add-on panels, a lease, or moving off NEM early: the numbers decide.
NEM protected when it should be
Non-export designs add panels without touching an existing NEM 1.0 or 2.0 agreement.
Free through Dec 31
The audit that produced every result on this page is free until the end of the year.
A.G. · Encinitas, CA · battery only
Before
A 5.4 kW system from 2012 and no battery. The home now uses 16,592 kWh a year; the panels make 8,900. Utility bill: about $298 a month.
The fix
One Tesla Powerwall 3 (13.5 kWh) to carry the evening peak and back up the home. Qualified for the federal prepaid discount.
Projected result
Monthly utility bill from about $298 to about $118, plus backup power through outages.
J.L. · Carlsbad, CA · more storage, no SDCP rebate
Before
An 11 kW system from 2023 with one Powerwall already. The home uses 19,576 kWh a year; the panels make 14,000. Bill: about $263 a month.
The fix
Two more Powerwall 3s (27 kWh) so the home runs on its own solar through the evening. Carlsbad is a Clean Energy Alliance city, so no SDCP rebate applies.
Projected result
Monthly utility bill from about $263 to about $114, with virtual power plant income available on top.
F.B. · Solana Beach, CA · non-export add-on, NEM 1.0 kept
Before
A 9.5 kW system from 2015 on NEM 1.0. The home uses 22,257 kWh a year. The audit found the system needed repair: it was making about 90% of what it should.
The fix
18 new panels (7.92 kW) designed non-export, plus a Powerwall 3. Nothing new is sent to the grid, so the NEM 1.0 agreement carries on untouched. The existing system’s repair brings it back to full production. Qualified for the federal prepaid discount.
Projected result
Production up from about 12,300 to about 24,200 kWh a year. Monthly utility bill from about $185 to $0.
S.K. · San Diego, CA · non-export add-on, NEM 2.0 kept
Before
A 6.27 kW system from 2018 on NEM 2.0. The home uses 13,789 kWh a year; the panels make 8,957. Bill: about $231 a month.
The fix
11 new panels (4.84 kW) designed non-export, plus a Powerwall 3, keeping NEM 2.0. Qualified for the federal prepaid discount.
Projected result
Production up from about 8,960 to about 16,600 kWh a year. Monthly utility bill from about $231 to about $24, just the connection charge.
R.B. · Carlsbad, CA · battery through a CEA lease
Before
A 4.25 kW system from 2016 on NEM 2.0. Bill: about $104 a month, and no backup power.
The fix
A Powerwall 3 through Clean Energy Alliance: $0 down, fully warrantied for 25 years, with a buyout option after year 6.
Projected result
Backup power for the home and its own solar running the evening peak, with a fixed agreement that rises far more slowly than utility rates.
D.H. · Encinitas, CA · getting ahead of the NEM 1.0 cliff
Before
Two systems, from 2008 and 2021, still producing everything they should. But the home’s usage has climbed from 4,000 to over 10,000 kWh a year and is still rising, and NEM 1.0 ends in 2028. When it does, the credits from those panels drop sharply and the bill climbs with them.
The fix
Rather than wait for the cliff, a complete system now: 16 new panels (7.04 kW) and two Powerwall 3s (27 kWh), sized for where usage is heading, while San Diego Community Power’s battery rebate is available ($9,450, applied to the loan) and before borrowing costs rise.
Projected result
Production up to about 24,500 kWh a year and two batteries to run the evening peak, so the home is insulated from SDG&E rather than exposed when NEM 1.0 ends.
Where we work
What's different depends on your utility. Find your city:
San Diego Community Power (SDCP)
San Diego · Encinitas · Ramona · Chula Vista · Imperial Beach · La Mesa · National City · Alpine · Lakeside · Spring Valley · Fallbrook · Valley Center · Jamul · Julian
If you already have solar here, the audit checks whether adding a battery could qualify for SDCP's rebate.
- Encinitas: The coastal marine layer can delay morning production, so we size for it.
- Ramona: Real fire risk and outage history: backup power often matters more than savings here.
Clean Energy Alliance (CEA)
Carlsbad · Oceanside · Vista · San Marcos · Solana Beach · Del Mar · Escondido
Owners here can add a battery through CEA Solar Plus with $0 down — the audit shows whether it pays.
- Oceanside: Lots of older homes: we check the main electrical panel up front.
- Del Mar: Salt air: we check mounting and wiring for corrosion.
- Escondido: Hot inland summers: air conditioning shapes system and battery sizing.
SDG&E (no community power program yet)
El Cajon · Santee · Poway · Lemon Grove · Coronado
On SDG&E’s own generation, the rate plan you’re on matters a lot; the audit checks it.
- Coronado: Joining San Diego Community Power, with service expected around 2028.
SDG&E in South Orange County
San Clemente · Dana Point · San Juan Capistrano
SDG&E bills and true-ups work differently from Edison's; the audit reads yours.
Southern California Edison (SCE)
Long Beach · The rest of Orange County
Edison rate plans differ from SDG&E's; the audit checks you're on the right one.
Straight answers
What is a Solar Health Audit — and do I need one?
An audit answers the question most solar owners can't: "Is this thing actually working for me?" Six data points tell the whole story: year-over-year consumption, year-over-year production, install date, current utility rates, your solar payment, and any true-up costs.
From those, the math falls out: yearly consumption × current utility rate = what you'd pay without solar. Subtract your annualized solar payments and true-ups = your real savings. Compare production to consumption = whether you're over- or under-producing, and whether usage changes (new EV? teenager with a gaming rig?) have outgrown your design. My audit also reviews your agreement terms against what's fair and flags rebates you're leaving unclaimed — SDCP funds, VPP enrollment, the works. If you've had solar 2+ years and never checked, you're overdue.
Request your audit →Do I actually need a battery in California?
Under net billing — yes, for almost everyone. Export credits were cut ~75%, so selling your excess solar to the grid is a losing trade most of the year. A battery stores your own daytime power for your own nighttime use, which is now the whole game. Without one, you'd need to size solar to only ~60-70% of usage and accept a permanent utility bill.
Batteries also unlock the stackable money: SDCP's $2,000–$6,000-per-battery rebate, VPP yearly payments, and those $1-$3.50/kWh August-September export credits. In 2026 California, the battery isn't the add-on. It's the strategy.