Reroofing with solar

I need a new roof, but I have solar. What now?

The panels come off, the roof goes on, the panels go back. The details decide whether it stays simple.

Book a free solar audit → More answers in the Knowledge Center

$219 · 20–45 minutes with David · fee may be applied toward a battery or new system

The short answer

Replacing a roof under solar means removing the system, reroofing, and reinstalling it, usually with a reroof permit and an electrical permit for the solar work. Have a licensed solar or electrical contractor do the removal and reinstall. Putting back the same system generally keeps your NEM status, while adding panels or making other changes can move you to the Solar Billing Plan, so get SDG&E’s answer in writing before the panels come down.

01

Permits

Expect a reroof permit plus an electrical permit for removing and reinstalling the solar.

02

The right contractor

A C-46 solar or C-10 electrical contractor should handle the system.

03

Same system, same NEM

Like-for-like generally keeps NEM. Changes are where the risk is.

Before the panels come down

Photograph everything

The array, wiring, labels and the inverter, plus a production screenshot, so you can compare afterward.

Ask about warranties

Removal by someone else can affect workmanship or roof warranties. Ask both sides in writing.

Think about timing

If an inverter is old, replacing it during the reinstall saves a second visit, but confirm it won’t change your NEM status.

General information from Your Energy Best; your account and agreement control. Last reviewed November 24, 2026. Sources: SDG&E: NEM requirements CSLB: check a license

Where we work

What's different depends on your utility. Find your city:

San Diego Community Power (SDCP)

San Diego · Encinitas · Ramona · Chula Vista · Imperial Beach · La Mesa · National City · Alpine · Lakeside · Spring Valley · Fallbrook · Valley Center · Jamul · Julian

If you already have solar here, the audit checks whether adding a battery could qualify for SDCP's rebate.

  • Encinitas: The coastal marine layer can delay morning production, so we size for it.
  • Ramona: Real fire risk and outage history: backup power often matters more than savings here.

Clean Energy Alliance (CEA)

Carlsbad · Oceanside · Vista · San Marcos · Solana Beach · Del Mar · Escondido

Owners here can add a battery through CEA Solar Plus with $0 down — the audit shows whether it pays.

  • Oceanside: Lots of older homes: we check the main electrical panel up front.
  • Del Mar: Salt air: we check mounting and wiring for corrosion.
  • Escondido: Hot inland summers: air conditioning shapes system and battery sizing.

SDG&E (no community power program yet)

El Cajon · Santee · Poway · Lemon Grove · Coronado

On SDG&E’s own generation, the rate plan you’re on matters a lot; the audit checks it.

  • Coronado: Joining San Diego Community Power, with service expected around 2028.

SDG&E in South Orange County

San Clemente · Dana Point · San Juan Capistrano

SDG&E bills and true-ups work differently from Edison's; the audit reads yours.

Southern California Edison (SCE)

Long Beach · The rest of Orange County

Edison rate plans differ from SDG&E's; the audit checks you're on the right one.

Straight answers

Will solar leak my roof?

Done right — no. Solar penetrations are flashed and sealed with materials rated for 25 years, exactly like any vent or skylight on your roof right now. If a leak from solar ever happens, it happens fast — usually within the first two years, from workmanship error — which is what the standard 10-year roof penetration warranty exists for.

Red flags worth knowing: repeated roof-leak complaints in an installer's reviews (one-offs happen; patterns don't lie), and paradoxically, a 25-year roof penetration warranty — that's a flashy sales gimmick from companies that won't exist long enough to honor it. And if your roof is old, replace it with the solar project: one crew coordination, one financing, and the roof portion can ride your program benefits. Roof + solar is one of the smartest combos in home improvement.

Read this answer on its own page →
How much maintenance does solar actually need?

Shockingly little — this is one place the sales guys undersell. Panels have no moving parts and run 25-30+ years. The honest maintenance list: watch your monitoring app (5 minutes a month), clean the panels once a year in low-rain areas like ours (before summer, after pollen season — de-ionized water and regular soap, never when panels are hot, or just hire a cleaner), and a system health check every 5-10 years.

The components that can actually need service over decades: inverters (that's why warranty length matters — 12.5 vs 25 years is a real difference) and batteries (10-15 year warranties). The panels themselves? They'll likely outlive your roof.

Read this answer on its own page →

More in the Knowledge Center →

Ready when you are.

Book a free solar audit →

Or call or text David · (858) 786-2204